It consists of a six-storey building, (low plus five), cover flat and a cellar dedicated to parking, storage rooms and the necessary facilities room.  

The plot has three pedestrian access, located in the southern Leguario Calle Pablo Neruda, Avenue and in the street "k", new layout, that allow access to the inside of the plot and all the portals.   

159 homes all are developed in the floors above ground.    

The building is divided into ten portals. Portals 1,2,3,4,8,9 and 10 have access from the inside of the plot area. 5, 6 and 7 portals is accessed directly from the street again traced although all portals have access from the inside of the Apple. 

Access to the garage is unique and is located in the Calle Pablo Neruda in his encounter with southern Leguario Avenue. It is a ramp with double-track input and output.   

Gives service to 264 parking spaces and storage rooms 159 as well as the quarters of facilities necessary to provide service to the building.

 

 

Data sheet:

Project:

      Building 159 houses "VPO", storage and garage   

Situation:

      Plot "VPO" 1-A of the Partial Plan Scope 4 "Leguario South" Parla (Madrid)

Total surface:

      22.677,26 m²

Construction company:

     Ferrovial Agroman S.A.

Date of construction:

      2007-2008